Construction of two substations, a 1.5 MW and a 3 MW.  The substations tie the Waihonu North and the Waihonu South solar plants to Hawaiian Electric Companies 46kv transmission line.  Pacific Power Electrical performed clear and grubbing, site grading, fencing, final grading, excavation, duct bank, concrete work, cable trench installation, steel erection, construction of all overhead 46kv electrical apparatus, set transformers, switchgear, battery cabinet,  control wiring, DC system, AC system, 15kv underground cabling, overhead 46kv bus and substation ground grid.