Construction of substation to connect a 5MW solar plant to the HECO 46kv transmission line.  Pacific Power Electrical performed excavation, final grading, fencing, duct bank, concrete work, cable trench installation, steel erection, construction of all overhead 46kv electrical apparatus, set transformers, switchgear, battery cabinet,  control wiring, DC system, AC system, 15kv underground cabling, overhead 46kv bus and substation ground system.